AI for Aerospace: From Predictive Maintenance to Flight Control

We design and deploy artificial intelligence systems: from prototype to production-ready solutions. Our team combines expertise in machine learning, data engineering and MLOps to make AI work not in the lab, but in real business.
Showing 1 of 1All 1566 services
AI for Aerospace: From Predictive Maintenance to Flight Control
Complex
from 2 weeks to 3 months
Frequently Asked Questions

AI Development Areas

AI Solution Development Stages

Latest works

  • image_website-b2b-advance_0.webp
    B2B ADVANCE company website development
    1318
  • image_web-applications_feedme_466_0.webp
    Development of a web application for FEEDME
    1226
  • image_websites_belfingroup_462_0.webp
    Website development for BELFINGROUP
    926
  • image_ecommerce_furnoro_435_0.webp
    Development of an online store for the company FURNORO
    1160
  • image_logo-advance_0.webp
    B2B Advance company logo design
    620
  • image_crm_enviok_479_0.webp
    Development of a web application for Enviok
    894

AI Products for the Aerospace Industry

The cost of a model error in aerospace isn't metrics — it's lives and hundreds of millions of dollars. Data is catastrophically scarce: an aircraft accumulates thousands of flight hours before a failure, and tests are not reproducible. This very contradiction — small data with stringent reliability requirements — defines the architecture of our AI solutions. We develop AI systems that are certifiable to DO-178C and operate under real-world conditions.

How AI Addresses the Small Data Problem in Predictive Maintenance?

The CFM56 aircraft engine is equipped with 250+ sensors. A single flight generates 1.5 GB of ACARS/QAR data. GE Aviation Digital Twin processes data from 40,000+ engines in real time. The key challenge is predicting RUL (Remaining Useful Life) of components. The NASA C-MAPSS dataset is the standard benchmark. Best results: Temporal Convolutional Network (TCN) and Transformer architectures, RMSE ~12–18 cycles on the FD001 test subset. In practice, this yields significant cost savings through timely component replacement.

The small data problem is solved via Physics-Informed Neural Networks (PINNs) and transfer learning: the model is trained on simulation data (NPSS), then fine-tuned on real engine readings using MAML. PINNs achieve 20% lower RMSE than pure TCNs with the same data volume. Anomaly detection in flight data: a normal flight differs from a dangerous pattern. VAE or Isolation Forest are trained on normal QAR traces.

Why Surrogate Models Accelerate CFD Optimization 600x?

CFD simulation of a wing: 6–12 hours on ANSYS Fluent. For multi-objective optimization, thousands of iterations are needed. A surrogate model (Gaussian Process or Neural Network) is trained on 200–500 CFD runs and then used instead of full simulation. Speed: 50 ms vs. 8 hours — a 600x speedup.

Here's how we build a surrogate model:

  1. Collect 200-500 CFD runs on a Latin hypercube.
  2. Train a Gaussian Process with Matérn kernel.
  3. Optimize using Expected Improvement (EI).
  4. Validate on a holdout set (R² > 0.95).

Bayesian Optimization with a GP surrogate finds the Pareto front in 300–500 iterations vs. 50,000+ for Grid Search. Frameworks: BoTorch (PyTorch-based), Dragonfly, scikit-optimize. The result: 15–25% mass reduction without loss of strength. The budget for such a module is determined individually based on geometry complexity.

Computer Vision for Non-Destructive Testing

An ultrasonic C-scan or thermographic image of a fuselage panel: a defect (delamination, crack) appears as a local intensity anomaly. Automation of manual analysis, which takes 4–8 hours per panel.

We use YOLOv8 or Mask R-CNN for defect detection, trained on datasets with synthetic augmentation (FEA thermal field simulation + Gaussian noise). In practice: precision 0.89, recall 0.91 on A320 CFRP panels. Additionally: 3D reconstruction from photographs (photogrammetry) for hangar inspection — the point cloud is compared to the CAD model.

Method Time per panel Precision
Manual inspection 4-8 hours ~70%
AI (YOLOv8) 2 minutes 89%

Onboard AI Systems

FPGA-based inference for real-time monitoring of the ARINC 429 bus. Requirements: latency < 1 ms, determinism, DO-178C certification (Level A). Models: quantized to INT8, exported to ONNX → TensorRT for NVIDIA Jetson Xavier AGX.

For unmanned systems: depth estimation from stereo or monocular cameras, obstacle detection (YOLO), path planning (RRT* with ML heuristic). Stack: ROS 2 + PyTorch + TensorRT on NVIDIA Jetson.

Certification and Explainability

DO-178C/DO-254 — standards for avionics software and hardware. AI components require ARP 4761 safety assessment. EASA has published AI Roadmap 2.0 — a framework for certifying ML systems in aviation.

Explainability: SHAP values for tabular models (PdM), Grad-CAM for CNNs in NDT. Regulators demand not only accuracy but also the ability to explain the model's decision.

What's Included

  • Documentation: model card, safety assessment report, verification plan.
  • Deliverables: trained models, monitoring dashboards, code repository.
  • Training: knowledge transfer to the client's team for operation and retraining.
  • Support: assistance during certification, 12-month warranty.

Development Timeline

From 10 to 24 months — depends on the AI system type, certification requirements, and data availability. NDT module without onboard use: 4–6 months. Onboard system with DO-178C certification: 18–24 months.

If you want to discuss a project, we will assess the task and propose a solution. Request a preliminary evaluation of your project. Get an expert consultation on AI in aerospace.

Comparison of RUL prediction approaches
Method RMSE (FD001) Training time Physics needed
TCN 12–15 2–3 hours No
Transformer 14–18 4–6 hours No
PINNs 10–13 6–8 hours Yes

Physics-Informed Neural Networks — introduction to the method. DO-178C — avionics software certification standard.